At precision and finishing operations of geometry generation the electrochemical machine working with ET-technology, allows to receive a part in 10... 100 times faster, than machines of competing technologies (for example, electrolytic erosion and multiaxis high-speed milling).
Here are some examples to compare productivity of ECM and EDM operations.
Machining methode | EDM | pECM |
---|---|---|
Part and tool overview | ||
Machining area | 40 cm² | 33 cm² |
Premachining | no | no |
Material | steel | Stainless steel |
Surface roughness, Ra | 0,08-0,15 um | 0,15 um |
Required tool number | 1 | 1 |
Tool wear | small | no |
Tool material | copper | Stainless steel |
Machining time | 4,5 hours (including 1,5 hours polishing ) | 0,5 hours |
Reference | http://www.sodick.ru/publications/brosure/neodinak.html | http://www.indec-ecm.com/en/scope/tools/ |
Machining method | EDM | pECM |
---|---|---|
Part and tool overview | ||
Machining area | 104 cm² | 80 cm² |
Premachining | 1 mm (stock after prlimenary milling) | 1 mm |
Material | steel 4Ch5MFS | Stainless steel |
Surface roughness, Ra | 0,15 um | 0,08 um |
Required tool number | 2 | 1 |
Tool wear | small | no |
Tool material | copper | Stainless steel |
Machining time | 24 hours (including 7 hours polishing) | 0,15 hours |
Reference | http://www.sodick.ru/publications/brosure/neodinak.html | http://www.indec-ecm.com/en/scope/aircraft_engine/ |
Material | Machining area, cm² | Machining depth, mm | Surface roughness Ra, um , um | Cycle time, hours | |
---|---|---|---|---|---|
12Ch18N9T | 1 | 3 | 0,02 | 0,8 | |
12Ch18N9T | 18 | 0,5 | 0,05 | 0,1 | |
ChVG | 1,5 | 1,5 | 0,1 | 0,2 | |
Ch12M | 20 | 20 | 0,1-0,2 | 3,5 |